Brooklyn Prospect Heights
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-01174-0057), so they can include other buildings on the same lot.
633 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Nov 8, 2019 | B | VIOLATION CLOSED | 2B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Oct 10, 2019 | B | VIOLATION CLOSED | 1C | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTH AND WEST WALLS APPROXIMATELY 4 SQUARE FEET IN THE KITCHEN LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 13336335 ISSUED 10-OCT-19 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). |
| Oct 10, 2019 | A | VIOLATION CLOSED | Not available | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED |
| Oct 10, 2019 | C | VIOLATION CLOSED | Not available | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ENTRANCE DOOR TO EAST COURT, 1st STORY |
| Oct 10, 2019 | C | VIOLATION CLOSED | 1C | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS AT THE APARTMENT IN THE ENTRANCE LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 10, 2019 | A | VIOLATION CLOSED | 1C | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTH AND WEST WALLS APPROXIMATELY 4 SQUARE FEET IN THE KITCHEN LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jul 25, 2019 | A | VIOLATION CLOSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN BULKHEAD LEADING TO ROOF AT PUBLIC HALL, 4th STORY |
| Jul 25, 2019 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING IN BULKHEAD LEADING TO ROOF AT PUBLIC HALL, 4th STORY |
| Jul 25, 2019 | B | VIOLATION CLOSED | Not available | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DEVICE (KEY OPERATED LOCK) INSTALLED AT BULKHEAD DOOR TO ROOF PREVENTING REENTRY FROM ROOF AT PUBLIC HALL, 4th STORY |
| Jul 25, 2019 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE 4TH, 5TH AND 6TH MARBLE TREAD UP FROM BOTTOM AT PUBLIC HALL, 4th STORY |
| Jul 25, 2019 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT PUBLIC HALL, 3rd STORY |
| Jul 25, 2019 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT PUBLIC HALL, 2nd STORY |
| Jul 25, 2019 | A | VIOLATION CLOSED | Not available | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED |
| Jul 25, 2019 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE LOWER RIGHT GLASS PANE AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY |
| Jul 25, 2019 | A | VIOLATION CLOSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ENTRANCE ARCH TO BUILDING AT SOUTH EXTERIOR WALL OF BUILDING (FRONT OF BUILDING |
| Jul 25, 2019 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE AT ENTRANCE ARCH TO BUILDING AT SOUTH EXTERIOR WALL OF BUILDING (FRONT OF BUILDING |
| Jul 25, 2019 | B | VIOLATION DISMISSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL FACADE AT SOUTH EXTERIOR WALL OF BUILDING (FRONT OF BUILDING) |
| Jul 25, 2019 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF GARBAGE BAGS PREVENTING DROP LADDER FROM FULLY EXTENDING DOWN AT SOUTH STACK (FRONT OF BUILDING) |
| Jul 25, 2019 | B | VIOLATION CLOSED | 4D | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER SASH AT WINDOW TO FIRE ESCAPE IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Jul 25, 2019 | B | VIOLATION CLOSED | 4D | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Jul 25, 2019 | B | VIOLATION CLOSED | 4D | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Jul 25, 2019 | B | VIOLATION CLOSED | 4D | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Jul 25, 2019 | B | VIOLATION CLOSED | 4D | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Jan 4, 2019 | A | VIOLATION CLOSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH, SOUTH WALL AT VESTIBULE AT PUBLIC HALL, 1st STORY |
| Jan 4, 2019 | A | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL, NORTH, SOUTH WALL AT VESTIBULE AT PUBLIC HALL, 1st STORY |
| Jan 4, 2019 | A | VIOLATION CLOSED | 1C | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE ELECTRICAL OUTLET COVER PLATE AT NORTH WALL IN THE KITCHEN LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 31, 2018 | B | VIOLATION CLOSED | Not available | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS AT BULKHEAD , 4th STORY |
| Dec 31, 2018 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE MARBLE TREADS 6TH UP. FROM BOTTOM AT PUBLIC HALL, 4th STORY |
| Dec 28, 2018 | B | VIOLATION CLOSED | Not available | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS EAST FIRE DOOR AT PUBLIC HALL, 1st STORY, SECTION AT NORTH |
| Dec 28, 2018 | A | VIOLATION CLOSED | Not available | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED |
| Dec 28, 2018 | B | VIOLATION CLOSED | 4C | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 5th ROOM FROM NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 28, 2018 | B | VIOLATION CLOSED | 4C | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 28, 2018 | B | VIOLATION CLOSED | 4C | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 28, 2018 | C | VIOLATION CLOSED | 4C | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 5th ROOM FROM NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Nov 4, 2018 | B | VIOLATION CLOSED | 1C | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ... IN THE ENTRANCE LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Nov 4, 2018 | C | VIOLATION CLOSED | 1C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT CEILING IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Nov 4, 2018 | B | VIOLATION CLOSED | 1C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD MOLDING ABOVE WEST WINDOW CASING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Nov 4, 2018 | B | VIOLATION CLOSED | 1C | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE WEST WINDOW LINTEL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Nov 4, 2018 | C | VIOLATION CLOSED | 1C | § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE BATHTUB IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Nov 4, 2018 | B | VIOLATION CLOSED | 1C | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Sep 25, 2018 | B | VIOLATION CLOSED | 1C | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ENTRANCE DOOR APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Sep 25, 2018 | A | VIOLATION CLOSED | 1C | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WINDOW FRAME AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Sep 25, 2018 | B | VIOLATION CLOSED | 1C | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Sep 25, 2018 | B | VIOLATION CLOSED | 1C | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Sep 23, 2018 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT PUBLIC HALL, 2nd STORY |
| Sep 23, 2018 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT PUBLIC HALL, 3rd STORY |
| May 8, 2017 | C | VIOLATION CLOSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM AT CELLAR |
| May 8, 2017 | C | VIOLATION DISMISSED | 1C | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Feb 27, 2017 | A | VIOLATION CLOSED | 4A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 4A, 4th STORY, APARTMENT AT SOUTH |
| Feb 27, 2017 | B | VIOLATION CLOSED | 4A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH |