Brooklyn East Flatbush-Rugby
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-04732-0042), so they can include other buildings on the same lot.
6 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Jul 7, 2005 | A | NOV SENT OUT | Not available | SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS & CEILIINGS THROUGHOUT 2ND STY. APT. |
| Jul 7, 2005 | C | NOV SENT OUT | Not available | SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE CEILING ELECTRIC LIGHT FIXTURE 2ND STORY PRIVATE HALL |
| Oct 24, 2000 | A | NOV SENT OUT | 1FL | SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 1FL, 1st STORY |
| Oct 24, 2000 | C | NOV SENT OUT | 1FL | SECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES BATHROOM AND KITCHEN IN THE ENTIRE APARTMENT LOCATED AT APT 1FL, 1st STORY |
| Oct 24, 2000 | C | NOV SENT OUT | 1FL | SECTION 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN BATHTUB IN THE BATHROOM LOCATED AT APT 1FL, 1st STORY |
| Oct 24, 2000 | C | NOV SENT OUT | 1FL | SECTION 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT WASHBASIN IN THE BATHROOM LOCATED AT APT 1FL, 1st STORY |