Brooklyn Bedford-Stuyvesant (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 24, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDINGS DEPARTMENT RECORDS. DEPT OF BUILDINGS RECORDS INDICATES 2 FAMILY. NOW ATTIC LEVEL HAS BEEN CONVERTED AND OCCUPIED AS SLEEPING QUARTERS WITH 2 ROOMS, FULL KITCHEN WITH GAS STOVE, LIVING AREA AND 3 PC BATHROOMS. |
| Aug 24, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | W/O A PERMIT. NOTED: AT ATTIC LEVEL-FULL HEIGHT PARTITION WALLS ERECTED TO CREATE 2 RMS, A LIVING AREA AND A BTHRM WITH DOORS. INSTALLED WATER & WASTE LINES FOR 3 PC BTHRM (TOILET, SINK, SHOWER) AND RESIDENTIAL SINK. INSTALLED ELECTRICAL WRING FOR (LIGHTS, OUTLETS, SWITCHES). INSTALLED GAS LINE FOR GAS STOVE. |
| Jan 15, 2014 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 19, 2009 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Dec 5, 2005 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Apr 11, 2003 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |