Brooklyn Bedford-Stuyvesant (East)
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-01654-0070), so they can include other buildings on the same lot.
35 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Nov 1, 2019 | I | INFO NOV SENT OUT | Not available | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED. |
| Oct 29, 2019 | B | NOV SENT OUT | 2 | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES (ELECTRICAL OUTLETS AND LIGHT FIXTURES) IN THE PRIVATE HALLWAY LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | B | NOV SENT OUT | Not available | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES (ELECTRICAL OUTLETS AND LIGHT FIXTURES) AT PUBLIC HALL, 2nd STORY |
| Oct 29, 2019 | B | NOV SENT OUT | 2 | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES (ELECTRICAL OUTLETS AND LIGHT FIXTURES) IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | B | NOV SENT OUT | 2 | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES (ELECTRICAL OUTLETS AND LIGHT FIXTURES) IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | A | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE (INOPERATIVE) LIGHT FIXTURE AT THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | C | NOV SENT OUT | Not available | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AT PUBLIC HALL, 2nd STORY |
| Oct 29, 2019 | C | NOV SENT OUT | Not available | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING AT PUBLIC HALL, 2nd STORY |
| Oct 29, 2019 | B | NOV SENT OUT | Not available | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE NORTH WALL AT PUBLIC HALL, 2nd STORY |
| Oct 29, 2019 | B | NOV SENT OUT | Not available | § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE (INOPERATIVE) LIGHT FIXTURE AT THE CEILING AT PUBLIC HALL, 2nd STORY |
| Oct 29, 2019 | B | NOV SENT OUT | 2 | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES AT THE CEILING IN THE KITCHEN LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | B | NOV SENT OUT | 2 | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES AT THE CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | A | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE (INOPERATIVE) LIGHT FIXTURE AT THE CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | A | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING COVER AT THE ELECTRICAL OUTLET ON THE EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | B | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE (INOPERATIVE) LIGHT FIXTURE AT THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | C | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | C | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | A | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES ON THE FLOOR IN THE BATHROOM LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | A | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE BASE CABINET AT THE WASHBASIN IN THE BATHROOM LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | C | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | B | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE NORTH AND WEST WALLS IN THE KITCHEN LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | C | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR UNKEYED PLASTER AT THE CEILING IN THE KITCHEN LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | C | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE KITCHEN LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | C | NOTICE OF ISSUANCE SENT TO TENANT | 2 | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 70 SQUARE FEET, ON THE CEILING AND WEST WALL IN THE KITCHEN LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | C | NOTICE OF ISSUANCE SENT TO TENANT | 2 | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 70 SQUARE FEET, ON THE CEILING AND WEST WALL IN THE KITCHEN LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | B | NOV SENT OUT | Not available | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES IN THE PUBLIC HALL AT PUBLIC HALL, 2nd STORY |
| Oct 29, 2019 | A | NOV SENT OUT | 2 | § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL SYSTEM FROM THE BUILDING ENTRANCE TO THE EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY |
| Oct 29, 2019 | C | NOV SENT OUT | 2 | § 27-2026 ADMIN. CODE: REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 2, 2nd STORY |
| Oct 28, 2019 | B | NOV SENT OUT | Not available | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 6TH AND 7TH CONCRETE TREADS UP FROM BOTTOM AT STOOP AT FRONT OF BUILDING |
| Oct 28, 2019 | B | NOV SENT OUT | Not available | § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE IRON NEWEL AT STOOP AT FRONT OF BUILDING |
| Oct 28, 2019 | B | NOV SENT OUT | Not available | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE IRON GATE AT FRONT OF BUILDING |
| Oct 23, 2019 | B | NOV SENT OUT | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 4,6,AND 7TH CONCRETE TREAD FROM BOTTOM STAIR FRONT YARD |
| Feb 27, 2004 | C | NOV SENT OUT | BLDG | SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF no electricity supplied to the electrical light fixture as per Sec 27-2037 HMC all stories IN THE PUBLIC HALL LOCATED AT PUBLIC PARTS BLDG |
| Aug 4, 2003 | A | NOV SENT OUT | Not available | SECTION 27-2005 ADMIN. CODE: REFIT ENTRANCE DOOR TO BUILDING |
| Aug 4, 2003 | B | NOV SENT OUT | Not available | SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING GLASS INSERT AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY |