NYC Building Report

Brooklyn Sunset Park (Central)

458 60 Street, Brooklyn

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 3-05782-0028), so they can include other buildings on the same lot.

6 records

Date Class Status Apartment Summary
Feb 14, 2026 A NOV SENT OUT 1 § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE KITCHEN , THE 4th ROOM FROM NORTH AT EAST, THE 1st ROOM FROM NORTH LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Feb 14, 2026 B NOV SENT OUT 1 HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Feb 14, 2026 B NOV SENT OUT 1 HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Feb 14, 2026 B NOV SENT OUT 1 § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Feb 14, 2026 B NOV SENT OUT 1 § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Feb 14, 2026 B NOV SENT OUT 1 § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH