NYC Building Report

Brooklyn East New York-City Line

456 Autumn Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

9 records

Date Status Type Summary
May 16, 2001 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT. WORK NOTED: CONSTRUCTION OF PARTITION WALL, CREATING ROOMS IN THE CELLAR THROUGHOUT REMEDY: OBTAIN A PERMIT IF FEASIBLE OR RESTORE THE CELLAR TO PRIOR LEGAL CONDITION
Jun 11, 1999 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT. WORK NOTED: CONSTRUCTION OF PARTITION WALLS, CREATING ROOMS IN THE CELLAR THROUGHOUT REMEDY: OBTAIN A PERMIT IF FEASIBLE OR RESTORE THE CELLAR TO PRIOR LEGAL COCNDITION
Dec 1, 1997 V-DOB VIOLATION - ACTIVE ES-ELECTRIC SIGNS NONE ES-ELECTRIC SIGNS NONE
Dec 1, 1997 V-DOB VIOLATION - ACTIVE ES-ELECTRIC SIGNS NONE ES-ELECTRIC SIGNS NONE
Dec 1, 1997 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Dec 1, 1997 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Dec 1, 1997 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL WORK W/O PERMIT WORK NOTED RENOVATING ENTIRE CELLAR NEW SHEET ROCK WITH WOOD STUDS PARTITIONS CONSTRUCTED CREATED 5 ROOMS AND A BOILER ROOM HUNG CEILING AT CELLAR AND FIRST STORY CONSTRUCTED REMEDY: STOP ALL WORK IMMEDIATELY OBTAIN A PERMIT IF FEASEBLE OR RESTORE THE PREMISES TO PRIOR LEGAL CONDITION
Aug 14, 1997 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BLDG INTERIOR: DEFECTS ARE: BROKEN AND ROTTED WOOD BEAM AT CELLAR REAR, BOILER ROOM AND THIRD FLOOR CENTER BATHROOM REMEDY: REPLACE THE BROKEN AND DEFECTIVE BEAMS. SUBMIT STRUCTURAL REPORT BY P.E. OR REGISTER ARCHITECT STATING THAT DEFECTIVE BEAMS REPLACED
Aug 14, 1997 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN INTERIOR & EXTERIOR OF THE BLDG. DEFECTS ARE: CRA