NYC Building Report

Brooklyn Bedford-Stuyvesant (East)

453 Decatur Street, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

8 records

Date Status Type Summary
May 30, 2001 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Aug 14, 2000 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL HAZARDOUS
Jul 24, 2000 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL HAZARDOUS
Jul 24, 2000 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO PROVIDE APPROVED PLANS AT PREMISES AT TIME OF INSPECTION (STOP ALL WORK IMMEDIATELY.) REMEDY: PROVIDE APPROVED PLANS
Jul 12, 2000 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN. DEFECT IS: ACCUMILATION OF RUBBISH AND DEBRIS AT SIDE YARD FRONT OF THE PREMISES. PILE OF CONSTRUCTION DEBRIS. MAINTAIN PREMISES
Jun 28, 2000 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL HAZARDOUS
Jun 28, 2000 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT. WORK NOTED: ENTIRE BUILDING STRUCTURE IS UNDER A GUT REHAB & CONSTRUCTION WORK NOTE AT 1ST FLOOR LEVEL FULL HEIGHT PA RTITION WALLS REMOVED & NEW 2" X 3" 8' HIGH STUDS INSTALLED. AT 2ND FL OOR LEVEL WINDOWS FRAMED TO DECREASE ORIGINAL SIZE FROM 30" X 4' HIGH, NOTE: THE WOOD PARTITIONS ARE UNPROTECT (COMBUSTIBLE) STOP ALL WORK!
Jul 11, 1994 V*-DOB VIOLATION - DISMISSED UB-UNSAFE BUILDINGS NONE UB-UNSAFE BUILDINGS NONE