Brooklyn Flatlands
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
2 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 16, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN SAFE CONDITION. ON/AROUND 05/28/2022 THE MASONRYCHIMNEY AT EXP2 COLLAPSED INTO THE ADJ BLDG AT 4527 AND INTO SIDEYARD,CHIMENY WAS SUPPORTED BY A MASONRY SHELF/CORBEL OWNER TO RETAIN NYSPE TO EVALUATE ENTIRE BLDG & FILE REPAIR DWGS W/DOB BLDG T/BE REPAIRED UNDER PERMIT BY 7/25/2022 |
| May 28, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION I OBSERVED THE CHIMNEY AT EXPOSURE 2 HAD COLLAPSED AND FELL ONTO NEIGHBORING PROPERTY. |