Brooklyn Brownsville
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 9, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER CONTROL #370428 VIO#080526PI31601TC DATED 08/05/26 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 09/05/26. AS OF 09/09/26 THE REQ;D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER VIO#080526PI31601TC |
| Aug 5, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN REQ'D-OBSVD SPALLING MASONRY AT EXP2&4. OBSVD CRACKED CONCRETE MASONRY AT EXP2 GROUND LEVEL.OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING WITH DOB&NYS TO EVAL THE ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 09/05/2026 |
| May 12, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 7, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 7, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 7, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |