Brooklyn East Flatbush-Rugby
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
2 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Mar 23, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 25, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTINO DOCUMENTS. FLOOR JOIST S ARE NOT STAGGERED FOR REQUIRED FIRE DIVISION AT PARTY WALLS. TWO ST EEL BEAMS INSTALLED UNDER FLOOR 1 ARE NOT SHOWN ON PLANS. STEEL HEADE R UNDER FLOOR 2 IS LARGER THAN DESIGN WITH STEEL ANGLE WELDED TO IT REMEDY: STOP ALL WORK. PROVIDE PROPOSAL FOR CORRECTION |