Brooklyn Bedford-Stuyvesant (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 29, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION #321385602 ON 01/23/2025 DUE TO SUPERINTENDENT WITHDRAWAL. |
| Mar 5, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT APPROXIMATELY 80 LF OF SHED AT EXP 1+10 LF EXTENSION OVER PROPER TY LINE AT EXP 2 + WRAP AROUND EXP 4 10 LF BEYOND CORNER BALCONY. TOTA L SHED TO BE 110 LF SHED TO BE COVER ALL SPACE BETWEEN CURB AND FACES OF BUILDINGS |
| Mar 4, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPROXIMATELY 30 LINEAR FEET OF SIDEWALK SHED ALONG EXPOSURE 1 AND 10 LINEAR FEET OF SIDEWALK SHED AT TO WRAP AROUND TO EXPOSURE 2 TO SAFEGUARD PUBLIC AND PROPERTY |
| Mar 3, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DOB SUMMONS ISSUED FOR STRUCTURE RENDERED NON COMPLIANT. AT TIME OF INSPECTION OBSERVED THAT THE METAL TRACK THAT SECURES THE GLASS PANELS ON BALCONY OF UNIT 6A DISLODGED AND FELL ONTO PEDESTRIAN SIDEWALK. LEAVING GLASS PANELS UNSECURED |