Brooklyn Carroll Gardens-Cobble Hill-Gowanus-Red Hook
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
9 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 30, 2026 | V-DOB VIOLATION - ACTIVE | EGNCY-EMERGENCY NONE | FULLY DEMOLISH THE BUILDING AND GRADE & FENCE SITE |
| May 12, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT APPROXIMATELY 23 LINEAR FEET OF SIDEWALK SHED AT EXPOSURE 1 TO SAFEGUARD THE PUBLIC AND PROPERTY |
| May 12, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REQUESTING ENGINEERING REPORT DUE TO BUILDING IN A STATE OF DISREPAIR. OBSERVED AT EXPOSURE 2 SIDING FALLING OFF AND DISPLACED BRICK THAT HAS FALLING TO GROUND LEVEL. CHIMNEY AT THE CORNER OF EXP# 2 AND1 IS IN DISREPAIR MISSING BRICKS AND BULGING. ALSO A SMALL OPENING AT THE ROOF LEVEL OF EXP# 2. |
| Jul 27, 2016 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 26, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH VACATE ORDER # 102/2014 ISSUED ,MARCH 18,2014 FOR ENTIRE PREMISES. OBSERVED ANTHONY GAMBALE ( OWNER ) OCCUPYING HOME |
| Apr 26, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO VEHICLE STRIKING BUILDING |
| Aug 13, 2014 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 18, 2014 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 27, 2014 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAIL TO MAINTAIN:2 STORY&CELLAR,WOOD FRAME&MASONRY BEARING WALL,CLASS3 NFP,2FAMILY RES. EXP2 MASONRY WALL WARPED&BULGING.FRONT CHIMNEY CELLAR WALL COLLAPSD.EXP3 WALL HORIZONTAL CRACK@GRADE&LEANING OUT.1ST FL FRAM SPLIT,ROTTED,MISSING WOOD JOISTS.SPLIT&SAGGING STAIR HEADER.STAIR SLOP FROM EXP4 WALL.LIC PE STRUCTL EVAL ENTIRE BLDG.FILE DRAWG BY 5/15/14 |