Brooklyn Clinton Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
20 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 31, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER CONTROL#370544 VIO#072226PI30201SB DATED 07/22/2026 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 08/24/2026. AS OF 08/31/2026 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER #072226PI30201SB |
| Aug 31, 2026 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER CONTROL#370544 VIO#072226PI30201SB DATED 07/22/2026 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 08/24/2026. AS OF 08/31/2026 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER #072226PI30201SB |
| Jul 27, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | AT EXPOSURE 1, APPROX. 50 LINEAR FT OF SIDEWALK SHED SHALL BE ERECTED ALONG THE FULL WIDTH OF THE FACADE, WITH AN EXTENSION OF 5 LINEAR FT TOWARD 421 GRAND AVE. ADDITIONALLY, PROVIDE CANTILEVER OF 5 LINEAR FT ALONG EXP 2 OF 423 GRAND AVE STARTING FROM EXP 1/2 CORNER. TOTAL OF 60 LINEAR FT OF SIDEWALK SHED |
| Jul 22, 2026 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY-AT EXPOSURE 1, APPROX. 50 LINEAR FEET OF SIDEWALK SHED BE ERECTED ALONG THE FULL WIDTH OF THE FACADE, WITH AN EXTENSION OF 5 LINEAR FT TOWARD 421 GRAND AVENUE. ADDITIONALLY, PROVIDE CANTILEVER OF 5 LINEAR FT ALONG EXP 2 OF 423 GRAND AV STARTING FROM EXP 1/2 CORNER TOTAL OF 60 LINEAR FT OF SIDEWALK SHED |
| Jul 22, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLN REQ'D-OBSVD @ EXP1 BRICK MASONRY STEP CRACK W/ CRACK EXTENDING INTO TOP FLOOR WATERTABLE CAUSING STONE TO BE SIGNIFICANTLY LOOSE AT THE EXP1/2 CORNDER NEAR PARAPET. OWNER TO IMMED RETAIN REG DESING PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN BY 08/24/26 |
| Jul 22, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD @ EXP1 LARGE BRICK MASONRY STEP CRACK THAT EEXTENDS INTO TOP FLOOR WATERTABLD CAUSING STONE TO BE LOOSE AT EXP1/2 PARAPET CORNER,@ EXP2 OBSVD MISSING MORTAR & LOOSE BRICKS AT PARAPET.AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D START 2024.SUBMIT ANNUAL PARAPET OBSERVATION REPORT FOR 2025 NO LATER 8/5/26 |
| Dec 1, 2024 | V-DOB VIOLATION - ACTIVE | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 |
| May 2, 2019 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| May 2, 2018 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 18, 2018 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 4, 2018 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 7, 2000 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 16, 1999 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 4, 1998 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 23, 1998 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Sep 16, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 10, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 16, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |