NYC Building Report

Brooklyn Bedford-Stuyvesant (West)

419 Tompkins Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

5 records

Date Status Type Summary
Oct 26, 2021 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL PER FEU INSPECTION ON 10/25/21 AND DUE TO THE STRUCTURALLY COMPROMISED GARAGE STRUCTURES ADJACENT TO THE LEFT SIDE OF THE YARD WE ARE ORDERING A PARTIAL VACATE OF THE REAR YARD, EXCEPT FOR EMERGENCY EGRESS, UNTIL THE GARAGES HAVE BEEN MADE SAFE AS DETERMINED BY THE DEPT OF BUILDINGS
Mar 3, 2015 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Mar 1, 2013 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
Dec 13, 2011 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Jan 1, 2009 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED