Department of Buildings violations attached to this BIN or tax lot.
14 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| May 10, 2023 | V*-DOB VIOLATION - DISMISSED | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| Sep 15, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONERS ORDER #340976 ISSUED ON 04/04/22 TO IMMED BRACE AND SHIRE THE FRONT BRICK WALL UNDER THE EMERGENCY WORK ORDER. AS OF 9/15/22 NO WORK HAS STARTED. REMEDY: IMMED COMPLY WITH COMMISSIONERS ORDER #340976 |
| Sep 7, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM-FRONT WALL IS IN STATE OF DISREPAIR. OUTER WHYTHE OF BRICK WALL IS DETACHING & BLUGING OUTWARD, CRACKED & SPALLED STUCCO NOTED @ REAR WALL. REMEDY: OWNER TO ENGAGE NYC PE AND CONTRACTOR TO REBUILD THE FRONT WALL UNDER PERMIT. FILE FOR PERMIT BY 10/1/22. COMPLETE BY 12/31/22 |
| Sep 7, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER. THE OUTER WYTHE OF THE FRONT WALL IS DETACHING & BULGING OUTWARD & IS AT RISK OF COLLAPSE. REMEDY: IMMED BRACE AND SHORE THE FRONT WALL BRICK UNDER DIRECT & CONTINUOUS SUPERVISION OF PE PE TO SUBMIT MEANS/METHOD.FILE FOR PERMIT WITHIN 48 HRS OF WORK START |
| Aug 29, 2022 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPROXIMATELY 30 LINEAR FEET OF SIDEWALK SHED AT EXPOSURE#1 COVERING THE ENTIRE FRONT YARD AND EXTENDING WITH A 5 FOOT CATCH ALL OVER THE LEFT SIDE ADJACENT PROPERTY ENTRANCE TO PROTECT THE PUBLIC AND THE PROPERTY |
| Aug 26, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED BRICK FACADE BULGING APPROVXIMATELY 4-5 INCHES AT THE TIME OF INSPECTION ALONG WITH A STEP CRACK AND A SUNKEN IN WINDOW. |
| Feb 7, 2000 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 4, 1998 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 16, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |