Brooklyn Mapleton-Midwood (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 15, 2024 | V-DOB VIOLATION - ACTIVE | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. |
| Jun 28, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | SEAL ALL ACCESIBLE OPENINGS FROM UNAUTHORIZED ENTRY TO THE BUILDING |
| Jun 27, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLAINT. OBSERVED AT 2ND FLOOR APARTMENT WINDOWS AND DOORS OUT, ROOF OPEN FOR ELEMENTS, WALLS AND CEILING DAMAGED, WATER DAMAGED THROUGHOUT BUILDING DUE TO FIRE AND FIREFIGHTER OPERATION. VACATE ENTIRE BUILDING. |
| Jun 27, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED AT 2ND FLOOR APARTMENT WINDOWS AND DOORS OUT, ROOF OPEN FOR ELEMENTS, WALLS AND CEILING DAMAGED, WATER DAMAGED THROUGHOUT BUILDING DUE TO FIRE AND FIREFIGHTER OPERATION. |
| Oct 17, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 16, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK ORD:1FL JOIST SEVERELY DETERIOR&SAGGING @REAR 20'AND VARIOUS AREAS. DOUBLE WOOD STRINGERS DETERIOR&INADEQ SUPPT'D @EXP1&3. LARGE WASHER MACHINE@1FLR SUPPT'D BY NON-ENGINEERED,SLOPED CONC COLUMNS.OWNR ENGAGE PE&CONTRCT TO IMMED INSTL 1FLR SHOR@CELLAR LEVEL,UNDER CONTIN SUPV OF PE&DAILY REPTS TO FEU. FILE JOB WITHIN 2 DAYS OF STRT OF WRK |
| Jul 16, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM:2STRY+C,WOOD FRAMED,1FLR JOIST SEVERELY DETERIOR&SAGGING @REAR 20' AND VARIOUS AREAS. DOUBLE WOOD STRINGERS WERE DETERIOR&INADEQUATELY SUPPORTED@EXP1&3.LARGE WASHER MACHINE@1FLR SUPPORTED BY NON-ENGINEERED SLOPED CONC COLUMNS.OWNR ENGAGE NYSPE EVAL ENTIRE BLDG&PREPARE SHORING AND REPR DWGS.REPR BLDG UNDER PERMIT STRT BY 8/5/19 & CMPL BY 9/27/19 |