NYC Building Report

Brooklyn Borough Park

4119 13 Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

7 records

Date Status Type Summary
Nov 14, 2025 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Apr 4, 2024 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL SITE VISIT 2/14/24,OBSRVD UNPERMTD,UNDESGND & UNINSPCTD EXCAVTN,UNDRPN ING,STRCTRL SCOPE,NO DEMO DRWGS,POSING POTNTL HAZARD 2 PUBLIC & PROPTY REMEDY: PERFRM EMER STABLZ AS PER APRVD DRWGS W F/T NYS PE & REG GC WORK COMMENCES NO LATER THAN 04/05/24
Feb 15, 2024 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL AC 28-104.7.11, 28-116.2.2, 28-301.1, BC 1817,3304,3309:SITEVISIT 2/14 /24,OBSRVD UNPERMTD,UNDESGND&UNINSPCTD EXCAVTN,UNDRPNNG,STRCTRL SCOPE, ,NO DEMO DRWGS,POSING POTNTL HAZARD TO PUBLIC&PROPERTY. REMEDY: RETAIN NYS PE4BI-WEEKLY STRCTRL STABLTY INSPCNS,ASESNG PROP, NOTFY DOB ,SUBMT RPTS2ENG BY 2/19,IDNTFY HAZRDS,RECOMD STBLZTN
Feb 11, 2024 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT PERMIT(S) - AT CELLAR LEVEL - EXCAVATION THROUGHOUT THE ENTIRE CELLAR ALONG WITH STRUCTURAL PARTITION / WALLS COMPROMISED CAUSING THE HIGH POTENTIAL OF THE INTERNAL COLLAPSE - NO STRUCTURAL DOCUMENTS FILED FOR THE EXCAVATION - SHORING - AND STEEL WORK - FULL VACATE ISSUED
Apr 25, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Aug 16, 1993 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED