Brooklyn East New York (North)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
156 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 25, 2024 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL SIDEWALK SHED AT EXPOSURE 1, APPROXIMATELY 20'LINEAR FEET TOTAL |
| Nov 25, 2024 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL SIDEWALK SHED AT EXPOSURE 1, APPROXIMATELY 17' LINEAR FEET TOTAL |
| Nov 25, 2024 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL SIDEWALK SHED AT EXPOSURE 1, APPROXIMATELY 100 LINEAR FEET TOTAL |
| Nov 22, 2024 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL SIDEWALK SHED AT EXPOSURE 1, APPROXIMATELY 140' LINEAR FEET TOTAL |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Aug 29, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 23, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 22, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 22, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 22, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 22, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 16, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ROOF COLLAPSED. PARTIALLY COLLAPSED 2ND FLOOR. UNBRACED EXTERIOR WALL. INADEQUATE BRACING OF THE PARTY WALL. |
| Aug 16, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: PARTIALLY REMOVED SUB-FLOORING. 5 JOIST REMOVED AND REPLACED WITH NEW JOIST AT 2ND FLOOR ADJACENT TO EXPOSURE # 3. UNBRACED EXPOSURE # 3 WALL AT 2ND FLOOR. INADEQUATE BRACING OF PARTY WALL. |
| Aug 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |
| Aug 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS. |