Brooklyn Bedford-Stuyvesant (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 7, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM-2/7/22 ADJ BLDGS@394-396 GATES AV SUFFRD FIRE &SUBSTANTIALLY COLLAPSED DUE TO FIRE,400 GATES AVE WAS DAMAGED,COLLAPSED CEILING, INTERIOR PARTITIONS,EXP4 ROOF OVERHANG SAGGING W/COLLAPSED BRICKS FROM 396 BLDG.OWNER TO RETAIN NYSPE-EVALUATE ENTIRE BLDG& FILE RPR PLANS W/ DOB.BLDG REPRD UNDR PRMT,START BY 03/14/22,COMPLTD/SIGNED OFF 4/22/22 |
| Feb 7, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO INTERIOR WALLS & CEILINGS ALONG WITH WINDOWS AND SKYLIGHTS REMOVED EXPOSING INTERIOR TO ELEMENTS DUE TO FIRE AT 394 GATES AVENUE. |
| Feb 7, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED FIRE, WATER AND SMOKE DAMAGE ALONG WITH WINDOWS AND SKYLIGHTS REMOVED DUE TO FIRE AT 394 GATES AVENUE. |