Brooklyn Park Slope
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 28, 1998 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: PARTITION ERECTED ON STAIRWAY BETWEEN SECOND AND THIRD FLOORS. ENCLOSING STAIRWAY LEADING TO AND FROM THIRD FLOOR WITH DOOR INSTALLED AND BARRED LOCK REMEDY: OBTAIN PERMITS AND APPROVALS IF FEASIBLE OR RESTORE PREMISES TO PRIOR LEGAL CONDITION |
| Oct 25, 1998 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PARTITION ERECTED ON STIRWAY BETWEEN SECOND AND THRID FLOORS ENCLOSING STAIRWAY HEADING TO AND FROM THIRD FLOOR WITH DOOR INSTALLED AND BARREL LOCK |
| May 16, 1996 | V%*-DOB VIOLATION - DISMISSED | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |