Brooklyn Bushwick (East)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
9 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 5, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REQUEST ENGINEERING REPORT DUE AN ABUNDANCE OF SOIL FROM CONSTRUCTION OPERATIONS TAKING PLACE AT EXPOSURE 2 (1388 BUSHWICK AVENUE) ALONG WITH MATERIAL HAS BEEN STORED ALONG EXTERIOR WALL POTENTIALLY COMPROMISING STRUCTURAL INTEGRITY OF THE BUILDING. |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 25, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. DUE TO EXCAVATION ONGOING AT ADJACENT PROPERTY 42 COOPER ST. THE FOLLOWING DAMAGE HAS OCCURRED. AT CORNER OF BUILDING AT EXPOSURE 2 + 3 LARGE VERTICAL CRACK APPEARS, ALSO NOTED AT EXPOSURE 3 VERTICAL CRACKS APPEAR BETWEEN WINDOWS AT CORNERS RUNNING VERTICAL. |
| May 15, 2014 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Sep 16, 1997 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 10, 1997 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1994 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 16, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |