Brooklyn Downtown Brooklyn-DUMBO-Boerum Hill
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-00183-0032), so they can include other buildings on the same lot.
14 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Nov 17, 2022 | I | VIOLATION DISMISSED | Not available | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED. |
| Apr 21, 2021 | I | VIOLATION DISMISSED | Not available | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED. |
| Jul 27, 2017 | A | NOV SENT OUT | 2 | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE 4th ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY |
| Jul 27, 2017 | B | NOV CERTIFIED LATE | 2 | § 27-2026 ADMIN. CODE: REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 2, 2nd STORY |
| Jul 27, 2017 | B | NOV CERTIFIED LATE | 2 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY |
| Jul 27, 2017 | B | NOV CERTIFIED LATE | 2 | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY |
| Apr 30, 2004 | C | NOV SENT OUT | Not available | SECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES KITCHEN SINK, WASH BASIN BATHROOM, 2ND STORY APT. 1. |
| Aug 7, 2003 | A | NOV SENT OUT | Not available | SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AROUND WINDOW 2ND STORY APT NORTHWEST ROOM WEST WINDOW |
| Aug 7, 2003 | B | NOV SENT OUT | Not available | SECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE HANDRAIL AT STAIRS 1ST TO 2ND STORY PUBLIC HALL |
| Aug 7, 2003 | B | NOV SENT OUT | Not available | SECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE WOOD TREAD AND RISER 1ST FROM TOP 1ST TO 2ND STORY PUBLIC HALL |
| Aug 7, 2003 | B | NOV SENT OUT | Not available | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS 2ND STORY APT CENTER AND NORTHEAST ROOM |
| Aug 7, 2003 | B | NOV SENT OUT | Not available | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILING 2ND STORY APT BATHROOM |
| Aug 7, 2003 | B | NOV SENT OUT | Not available | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING 2ND STORY APT REAR ROOM |
| Aug 7, 2003 | B | NOV SENT OUT | Not available | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE BALANCER AT LOWER SASH 2ND STORY APT KITCHEN WINDOW |