NYC Building Report

Brooklyn Flatbush (West)-Ditmas Park-Parkville

3919 18 Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

8 records

Date Status Type Summary
May 19, 2025 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL SEAL ALL FIRE DAMAGED ACCESSIBLE OPENINGS TO SAFEGUARD THE PUBLIC AND PROPERTY
May 18, 2025 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL OBSERVED WALLS AND CEILING DAMAGED , WATER DAMAGED THROUGHOUT, ROOF OP EN TO THE ELEMENTS AT 3 STORES 3915, 3917 AND 3921 18TH AVENUE FUE TO FIRE. **** OWNER TO HIRE NRSPE TO SUBMIT REPORT TO ERTINSPECTIONS@BUIL DINGS.NYC.GOV W/IN 30 DAYS ADDRESSING ALL CONDITIONS W/PLANS ,PHOTOS,R ECOMENDING TIME FRAME OF REPAIRS TO BE COMPLETED
May 18, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLIANT OBSERVED CEILING AND WALLS DAMAGED , WATER DAMAGED AND ROOF OPEN TO THE ELEMENT S DUE TO FIRE . VACATE ENTI RE STORE
May 18, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLIANT OBSERVED STORE FRONT GLASS OUT, WALL AND CEILING DAMAGED , ROOF OPEN TO THE ELEMENTS WATER DAMAGE THROUGHOU T. VACATE ENTIRE STORE STURCTURE MUST BE MAINTAIN IN CODE COMPLIANT MANNER
May 18, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLIANT OBSERVED STORE FRONT GLASS OUT, CEILI NG AND WALLS DAMAGED, WATTER DAMAGED THROUGHOUT, ROOF OPEN TO THE ELEM ENTS DUE TO FIRE. VACATE ENTIRE STORE STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNER
Jun 1, 1994 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Aug 16, 1993 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 1, 1993 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED