DOB violations

Department of Buildings violations attached to this BIN or tax lot.

7 records

Date Status Type Summary
May 3, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL DUE TO ILLEGAL WORK ON STAIRWELL A NON SET OF METAL STAIRS INSTALLES F ROM CELLAR / 1ST & 2ND FLOOR . WELDING WAS PERFORMED ON BRACKETS OWNER TO HIRE NYSPE TO SUBMIT REPORT TO EMAIL OF ISSUING UNIT W/IN 30 DAYS ADDRESSING ALL CONDITIONS W/PLANS.PHOTOS, RECOMENDING TIME FRAME AND REPAIRS
May 3, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL DUE TO FIRE AND FIRE FIGHTING OPERATIONS SHEETROCK WITH FIRE BARRIER B ETWEEN 1ST & CELLAR WAS REMOVED ALONG EXPRESS STAIRWAY . EXCESSIVE FLOODING ALONG CELLAR DAMAGING MULTIPLE AREAS ALONG CELLAR & 1ST FLOOR OBTAIN PERMITS AND MAKE NEEDED CORRECTIONS
Dec 20, 2018 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Dec 21, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Dec 13, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 24, 2015 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Oct 31, 2014 V*-DOB VIOLATION - DISMISSED EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST