Brooklyn Windsor Terrace-South Slope
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Mar 13, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD BLDG IN A STATE OF DISREPAIR W/EVIDENCE OF CONTINUED SETTLEMNT OF THE BLDG OBSRVD BLDG LEANING APPRX 1"-2" TOWRDS EXP4&APPRX 2"-4" TWRDS EXP1.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #123024CFEU30705AK (CONTROL # 342902) IMMEDIATELY |
| Dec 30, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD BLDG IN A STATE OF DISREPAIR W/EVIDENCE OF CONTINUED SETTLEMNT OF THE BLDG OBSRVD BLDG LEANING APPRX1"-2" TWRDS EXP4&APPRX 2-4" TWRDS EXP1.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&PERM RPAIR UNDR PRMT.FILE FOR RPAIRS BY 3/3/25.SGN OFF RPAIRS BY 6/3/25 |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |