Brooklyn Bushwick (West)
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-03176-0044), so they can include other buildings on the same lot.
5 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Jun 16, 2022 | A | VIOLATION CLOSED | 205 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND THE NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 205, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jun 16, 2022 | A | VIOLATION CLOSED | 205 | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT FLOOR IN THE BATHROOM LOCATED AT APT 205, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jun 16, 2022 | A | VIOLATION CLOSED | 205 | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 205, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jun 16, 2022 | B | VIOLATION CLOSED | 205 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL AND THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 205, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jun 15, 2022 | C | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR AT PUBLIC HALL, 2nd STORY, SECTION AT NORTH |