Brooklyn Coney Island-Sea Gate
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 10, 2025 | V%-DOB VIOLATION | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Mar 14, 2022 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | 1)ERECT AN APPROXIMATE TOTAL OF 82 LINEAR FEET OF TIGHT BOARD.FENCE ALONG THE REAR PERIMETER OF LOT. 2) SEAL ALL ACCESSIBLE OPENINGS TO PREVENT UNAUTHORIZED ACCESS AND TO SAFEGUARD THE PUBLIC AND PROPERTY |
| Mar 11, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STEEL EXTERIOR STAIR @EXP4 INADEQUATELY SUPPORTED WITH DETERIORATING WOOD FRAMING.EXP4 MSNRY WALL HAD VERTICAL CRCK EXTENDINGFROM GRADE LVL APPROX 3'TALL UP TO BOTTOM OF WINDOW OWNR RTAIN NYSPE-EVALU ENTIRE BLDG &PREPARE/FILE RPR DWGS W/ DOB.RPR BLDG UNDR PRMT BY4/25/22 &COMPLT/SIGN OFF BY 6/3/22 |
| Mar 11, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN-2FL EXP 2/3 REAR BALCONY CONCRETE SLAB ON WOOD APPRX 12'X12' COLLAPSED INTO 1FL,JOISTS CRACKED,SEVERLYSAG@ RISK OF COLPS.EXP2&WALL @2/3 CRNR INADQ BRACD.EXP3-2FL CRKD/BULG OWNR RETAIN NYSPE-EVAL ENTIRE BLDG&PREP/FILE DWGS.RPR BLDG UNDR PRMT BY 4/25/22&COMPLETE/SIGN-OFF BY 6/03/22 |
| Mar 11, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED EXTERIOR BALCONY'S CONCRETE SLAB HAS COLLAPSED THROUGH INTO 1ST FLOOR & CELLAR. ALSO SEVERE STEP CRACKS AT EXPOSURE #3/4 WHERE SECTIONS OF MASONRY ARE BULGING & LEANING. |
| Dec 30, 2015 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |