Brooklyn Bedford-Stuyvesant (West)
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-01829-0040), so they can include other buildings on the same lot.
7 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| May 8, 2018 | B | CERTIFICATION POSTPONMENT DENIED | Not available | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES AT PUBLIC HALL STAIRS, 3rd STORY |
| May 8, 2018 | B | CERTIFICATION POSTPONMENT DENIED | Not available | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR ..ALL WALLS AND CEILING AT PUBLIC HALL, 3rd STORY |
| May 8, 2018 | B | CERTIFICATION POSTPONMENT GRANTED | 3 | § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK AT ENTRANCE DOOR IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3, 3rd STORY, APARTMENT AT EAST |
| May 8, 2018 | B | CERTIFICATION POSTPONMENT GRANTED | 3 | § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE UNHINGED DOOR AT ENTRANCE IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3, 3rd STORY, APARTMENT AT EAST |
| May 8, 2018 | B | CERTIFICATION POSTPONMENT GRANTED | 3 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR ..THE CEILING, WEST AND SOUTH WALLS IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3, 3rd STORY, APARTMENT AT EAST |
| May 8, 2018 | B | CERTIFICATION POSTPONMENT GRANTED | 3 | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3, 3rd STORY, APARTMENT AT EAST |
| May 8, 2018 | A | NOV SENT OUT | 3 | § 27-2026 ADMIN. CODE: RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, APARTMENT AT EAST |