Brooklyn Williamsburg
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 4, 2021 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT APPROXIMATELY 30 LINEAR FEET OF SIDEWALK SHED AT EXPOSURE # 1 (UNION STREET)ND RETURN AT EXPOSURE # 2(HOPE STREET) OVER THE SUBWAY STATION ENTRANCE APPROXIMATELY 65 LINER FEET TO SAFEGUARD THE PUBLIC AND PROPERTY |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| Sep 24, 2001 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT: WORK NOTED: AT CELLAR LEVEL FULL HEIGHT PETITION WALLS ERECTED CREATING A OFFICE WITH 2 COMPUTERS & DESK REMEDY: OBTAIN PERMIT TO LEGALIZE OR RESTORE TO PRIOR LEGAL CONDITION |
| Mar 28, 1989 | V-DOB VIOLATION - ACTIVE | P-PLUMBING NONE | P-PLUMBING NONE |