Brooklyn Downtown Brooklyn-DUMBO-Boerum Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 28, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT TIME OF INSPE CTION,OBSERVED CRACKED/MISSING MASONRY;STEP CRACKS,DAMAGED/SPALLING BR ICKS AND STUCCO;CRACKED AND MISSING MASONRY OF PARAPET AND LEANING EDG E OF EXPOSURES 2 AND 3.REMEDY:REPAIR AND/OR REPLACE |
| Mar 11, 2002 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Apr 27, 1999 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: ERECTION OF PIPE SCAFFOLD 5'X 5' A FRAME ABOVE SIDE WALK SHED BRIDGE UP TO THE 4TH STORY REMEDY: OBTAIN ALL NECESSARY PERMITS & APPROVALS FROM DOB |
| Feb 24, 1995 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |