Brooklyn Kensington
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 21, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM-BLDG SUFFERED A 3 ALARM FIRE ON 04/21/2022. SIDING AND SHEATHING CHARRED AT EXP3(REAR)& EXP4(NORTH)WALLS W/SOME CHARRED STUDSAPPROX 17FT X 15FT 1 STORY REAR EXTENSION ROOF FULLY COLLAPSED NYSPE STRUCT ENG'R TO IMMED EVALUATE ENTIRE BLDG & DESIGN REPAIRS.FILE REPAIRS BY 06/27/2022. OBTAIN PERMITS |
| Apr 21, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER-BLDG SUFFERED A 3 ALARM FIRE ON 04/21/2022.SIDING AND SHEATING CHARRED AT EXP3(REAR)AND 4(NORTH)WALLS W/SOME CHARRED STUDS. APPROX 17FTX15FT 1 STROY REAR EXTENTION ROOF FULLY COLLAPSED AND EXP4 WALL PARTIALLY COLLAPSED. REMEDY: IMMED INSTALL TIGHTBOARD FENCE TO ENCLOSE REAR YARD ALONG EXP2 PROPERTY LINE FILE FOR PERMITS |
| Apr 21, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | THE PREMISES SUSTAINED EXTENSIVE FIRE , WATER AND FIRE FIGHTING OPERATIONS THROUGH-OUT. THE REAR EXTERIOR WALL IS OPEN, THE ROOF FIRE CHARRED, WINDOWS BROKEN OR MISSING. |
| Jan 16, 2013 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |