Brooklyn Sunset Park (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
26 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 15, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | BUILT W/O PROPER INSPTN,CEU'S ENGINEER'G AUDIT-JOB#32124754,BLDG TOPPED OUT W/O SPECIAL INSPTN,NOT CONFORMD TO APPRVD CONST DOCS I.E., PART OF LATERAL RESISTG SYSTM MISSING IN AS-BUILT STRUCTURE. REMEDY: FAIL2COMPLY W COMISSIONER'S ORDR,VIO#011024CEU30702PW 2REMDY BLDG STRCTURE2CONFORM2APPRVD DOCS. COMPLY W ORDR & CODE |
| Feb 1, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | ADD'L INFO:CEU'S STRCT'L ENGINEER'G AUDIT ON JOB# 321247254,PROVIDED EOR,BGM ENGINEERING LLC, OBJECTIONS ON STRCT'L DRAWINGS DATED 10/4/2016.ON 5/15/23. REMEDY: FAIL2COMPLY W COMMISSIONER'S ORDER 011024CEU30701PW. AS OF 2/1/24, BGM ENGINRNG HASN'T SUBMITTED REQUESTED INFORMATION |
| Jan 10, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | BUILT W/O PROPER INSPTN,CEU'S ENGINEER'G AUDIT-JOB#32124754,BLDG TOP- PED OUT W/O SPECIAL INSPTN,NOT CONFORMD TO APPRVD CONST DOCS, E.G., PART OF LATERAL RESISTG SYSTM MISSING IN AS-BUILT STRUCTURE REMEDY: OWNER TO REMEDY BLDG STRCTR TO CONFORM TO THE APPROVED CONSTRC DOCUMENTS & THE CODES & SIGN OFF REMEDIAL WRK BY 4/30/2024 |
| Jan 10, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | ADD'L INFO:CEU'S STRCT'L ENGINEER'G AUDIT ON JOB# 321247254,.PROVIDED EOR,BGM ENGINEERING LLC, OBJECTIONS ON STRCT'L DRWGS DATED 10/4/2016 ON 5/15/23. REMEDY: EOR 2 PROVIDE WRITTEN RESPONSES 2 CEU'S OBJECT'NS SUBMIT UPDATED COMPLIANT STRCT'L DWGS,S/S PLAN/EXP4 WALL BY 01/24/24 |
| May 22, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | ALONG EXP#4, 3 STORY HEIGHT CMU LOAD BEARING WALL SUPPORTED BY BRICK FOUNDATN. WALL TEMPORARILY BRACED UNDR EMERGENCY WRK ORDER CONTROL# 340832. REMEDY:OWNR 2 PROVIDE S/S ENGINEER'S STRUCTRL STABILITY REPRT BY 5/2/23. AS OF 5/22/23,FAILURE TO COMPLY W. COMMISSIONER'S ORDER DOB VIO #042123CEU30701PW |
| May 22, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | CEU REQUEST EOR,BGM ENGINEERING LLC 2 PROVIDE EOR'S RESPONSES TO CEU'S OBJECTIONS.ADDRESS PERMANENT REPAIR OF WHOLE CROSS SECTION OF EXISTING BRICK FOUNDATION WALL ALONG EXP#4 NO LATER THAN 4/26/23. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER DOB VIOLATION #042123CEU30702PW. AS O F |
| Apr 21, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | ALONG EXP#4,3 STRY HEIGHT CMU LOAD BEARNG WALL SUPPORTED BY BRCK FOUND WALL,TEMPORARILY BRACED UNDR EMERGNCY.WRK ORDR(CONTROL#340832).OWNR2 PROVIDE S/S ENGINEERS STRCTRL STABILITY RPT/EXISTING BRICK FOUND WALL ALONG EXP#4 BY 5/2/2023 |
| Apr 21, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | ADDITONAL INFORMATION:UNDER CEU STRUCTURAL AUDIT,CEUREQUESTS EOR,BGM ENGINEERING LLC TO PROVIDE EOR'S RESPONSES TO CEU'S OBJECTIONS.SUBMIT SGND/SEAL PRTCL/REINSPECT/RETESTG/PERMANENT REPAIR OF WALL ALONG EXP#4 NO LATER THAN 04/26/2023 |
| Apr 21, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | ADDITIONAL INFORMATION:UNDER CEU STRUCTURAL AUDIT,OBSERVEDSEVERAL STRUCTRL ITEMS IN PLACE NOT CONFORMD 2 APPROVD CONSTRUCTN DOCSE MISSING STEEL MOMENT FRAME,NON-CONFORMED FOUNDATION WALL.CEU REQUESTS ON FILE,REGIONAL TESTING CORP.2 SUBMIT NCRS,&LOCATIONS OF ALL STRCTRL ITEMS NO LATER THAN 4/26/23 |
| Oct 21, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER:CMU WALL IS IN DISREPAIR CONDITION. THE EXISTING BRICK FOUNDATION WALL IS CURRENTLY NOT BRACED IN OUT OF PLANE DIRECTION AND STRUCTUALLY NOT STABLE. REMEDY: THE EXISTING BRICK FOUNDATION WALL TO BE BRACED IMMED UNDER THE CONTINUOSLY SUPERVISION OF NYSPE AND FILE THE EMERGENCY WORK WITHIN 48 HRS SUBMIT REPORT |
| Jul 8, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM-THE BLDG ON ADJ LOT AT 367 36 STREET WAS PREVIOUSLY DEMOLISHED W/A CELLAR LEVEL BRICK PARTY WALL REMAINING ALONG LOT LINE SHARED AT 365 & NEW CONSTRUCTION BUILT OVER PARTY WALL.REMAINING CELLAR PARTY WALL IN A STATE OF DISREPAIR. REMEDY:NYSPE STRUCTUAL ENG;R TO IMMED EVAL ENTIRE CELLAR PARTY WALL & DESIGN PLANS.FILE FOR REPAIRS |
| Feb 19, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Feb 19, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE CONTACT THE BOROUGH COMMISSIONER OFFICE AT 718 802-3677 |
| Feb 19, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE CONTACT THE BOROUGH COMM. OFFICE AT 718 802-3677 |
| Feb 7, 2018 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 27, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 23, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 23, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 28, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 3, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 25, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 30, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 18, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAIL TO COMPLY W/COMMISSIONERS ORDER#081616FEU30701AD,ISSUED 8/16/16 REQ OWNER TO HIRE PE FOR EVALUATION OF BLDG&FILE/PLANS/OBTAIN PERMITS BY 9/2/16& TO HAVE STARTED REPAIRS TO FOUNDATION WALL BRICK MASONRY BY 9/12/16.REMEDY:COMPLY WITH REFERENCED COMMISSIONERS ORDER IMMEDIATELY |
| Oct 19, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 16, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FM BLDG.BRICK MASONRY FOUNDATION WALL AT CELLAR HAS EXTREME&SEVERE COND OF LOOSE MORTAR&DETERIORATED/MISSING BRICK FROM WEATHERING& EXPOSURE.LARGE HOLE AT THE N/E CORNER DUE TO MISSING BRICK.REMEDY: OWNER TO HIRE PE PROF ENG'R TO FILE PLANS AFTER EVALUATION OF ENTIRE BLDG&OBTAIN PERMITS NO LATER THAN 9/2/16&START REPAIR NO LATER 9/12/16 |
| Aug 18, 2013 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING |