Brooklyn Bushwick (West)
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-03165-0023), so they can include other buildings on the same lot.
4 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| May 8, 2026 | A | VIOLATION DISMISSED | Not available | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. |
| Jan 27, 2019 | C | VIOLATION DISMISSED | 4FL | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4FL, 4th STORY, APARTMENT AT NORTH |
| Jan 14, 2019 | A | NOT COMPLIED WITH | 2 | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ( INOPERATIVE ) BELL/BUZZER/INTERCOM SYSTEM FROM FRONT ENTRANCE OF BUILDING TO PANEL AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2, 2nd STORY, APARTMENT AT NORTH |
| Jan 14, 2019 | A | NOT COMPLIED WITH | 2 | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE (SLOPING) WOOD FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, APARTMENT AT NORTH |