NYC Building Report

Brooklyn East Flatbush-Farragut

3415 Farragut Road, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

14 records

Date Status Type Summary
Jun 30, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #031225CFA01 701YC REQUIRED THE IMMEDIATE 100% HANDS ON INSPECTION OF ALL FACADES B Y A PE/RA AND SUBMIT A REPORT TO FACADES VIA EMAIL IMMEDIATELY.AS OF 6 /30/26,NO HANDS ON INSPECTION SUBMITTED TO FACADES UNIT.REMEDY:COMPLY WITH DOB VIOLATION #031225CFA01701YC IMMEDIATELY
Mar 12, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM DUE TO OBSRVED UNSF FACDE CONDIT @ EXP2 W.ELEV OBSRVED FALLEN OFF EIFS STUCCO WALL, LOOSE EIFS STUCCO WALL FROM ROOFEDGE TO 6FL. A LARGE PORTION OF EIFS STUCCO WALL ARE MISSING FROM THE EXTER WALL. REMDY: IMMEDLY RETAIN SERVICE OF NYS RDP TO INSPECT/EVALUTE 100% OFHANDS-ON OF UNSF FACDE CONDIT.SUBMIT PHOTO OF CORRCTION & REPRT TO FACADE@B.N.G
May 29, 2024 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 15, 2024 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Mar 26, 2024 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO RESPOND TO OBJECTIONS ISSUED FOR TPP AUDIT FOR INADEQUATE TENANT PROTECTION PLAN FOR JOB #B00930975-I1.
Mar 18, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL .PARTIAL VACATE ORDER ON 03/12/24 BY A DACADE INSPECTOR THERE IS A LARGED AREA OF EXTERIOR.INSULATION EXISTING INISING SYSTEM WALL FALLIN OFF THESEN
Mar 12, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER TO SECURE UNSAFE FACADE IN THE FOLLOWING OF INCID ENT 42936.THE FALLEN EXTERIOR INSULATION FINISHING SYSTEM AT EXP2 WEST ELEV.FOR THE SAFETY OF PUBLIC,OWNER IS REQUIRED TO PROVIDE SAFETY MEAS URES AT OTHER EXPOSURES.REMEDY:IMMEDIATELY PROVIDE SAFETY MEASURES SUC H AS SWS AT EXP1 SOUTH ELEV,EXP2,EXP3 NORTH ELEV,EXP4 EAST ELEV,CYARD
Mar 11, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL . AT TIME OF INSPECTION OBSERVED AREA OF FOAM PANELS AND STUCCO (APPROX.. 50FT X 20FT ) AT 7TH STY LEVEL HAVE BECOME DETACHED FROM BUILDING AND FALLEN TO PEDESTRIAN SIDEWALK AT EXP.1.
Jun 1, 2022 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Oct 14, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 14, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 14, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Mar 4, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 19, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION