Brooklyn Clinton Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 9, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | UNPERMITTED/UNDOCUMENTCONSTUCTION WORK .CREATING AN ADDITONAL FLOOR ON ROOF OF A 2-STORY BLDG, CONVERTING INTO 3-STORY . STRUCTURAL STABILITY OF BUILDING WITH NO STRUCTURAL DETAIL/DRAWINGS/PERMITS FILED AS PER CODE. ENGINEERS REPORT FOR STRUCTURAL STABILITY REQUIRED WITHIN 5 DAYS. |
| Nov 14, 2000 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: FULL PARTITIONS ERECTED AT 2ND STORY CREATING ROOMS, WITH LIVING ROOM, BEDROOMS, BATHROOM AND KITCHEN SPACE WITH GAS STOVE REMEDY: OBTAIN A PERMIT |
| Nov 14, 2000 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Sep 17, 1997 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |