Brooklyn Sunset Park (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 3, 2001 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | ECB |
| Jul 10, 2001 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK W/O PERMIT. NOTED: A ROOF LEVEL AN 18" HIGH PLATFORM WITH TAR PAP ER AND FLASHING WAS CONSTRUCTED ON TOP OF EXISTING ROOF CREATING A PLENUM BET. THE 2 ROOF ADN HOUSING A LIBERTY SUMP PUMP 115V 60HZ TO PUMP WATER THROUGH A 1.5" HOSE TO GUTTER AT REAR OF BLDG. REMEDY: REMOVE ILLEGAL ROOF STRUCTURE AND SUMP PUMP |
| Feb 16, 2001 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: AT ROOF LEVEL A 18" PLATFORM EXIST WITH TARPAPER & FLASHING CEMENT CONSTRUCTED ABOVE ORIGINAL ROOF CREAT- ING A PLENUM (SPACE) BETWEEN THE 2 ROOFS. NOTE: RESTING INSIDE A 16"X 16" SQ HOLE AS A LIBERTY SUMP PUMP 115V 60HZ CONNECTED TO AN EXTENSION REMEDY: REMOVE THE ILLEGAL STRUCTURE - SUMP PUMP & PROTECT |
| Feb 16, 2001 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT PERMIT. WORK NOTED: AT ROOF LEVEL A 18" HIGH PLATFORM WITH TAR PAPER & FLASHING WAS CONSTRUCTED ON TOP OF EXISITNG ROOF CREATING A PLENUM (SPACE) BETWEEN THE 2 ROOFS & HOUSING A LIBERTY SUMP PUMP 115V 60HZ TO PUMP WATER THRU A 1 1/2" HOSE TO GUTTER AT REAR OF BLDG. REMEDY: REMOVE ILLEGAL ROOF STRUCTURE & SUMP PUMP |