Brooklyn Carroll Gardens-Cobble Hill-Gowanus-Red Hook
336 Van Brunt Street, Brooklyn
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
10 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 23, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERPERMIT B01087560-L1. DUE TO CONTRACTOR WITHDRAWAL |
| Dec 11, 2024 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 13, 2024 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 21, 2024 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 10, 2024 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | 1)REMOVE CONSTRUCTION MNATERIAL/DEBRIS/EQUIPMENT FROM PUBLIC WALKWAY & BACK INTO PROPERTY. 2)REPAIR DAMAGE FENCE 3) RELOCATE FENCE APPROX 15' BACK ONTO PROPERTY LINE 4) REMOVE YODOCK BARRIER |
| May 18, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OPERATIONS IN PROGRESS, SITE CONDITIONS NOT CONFORMING DE-WATERING REQUIRED, HOWEVER - NO DESIGN FOR SCOPE OF WORK, STOP ALL WORK BACKFILL TO GRADE UNDER THE FULL TIME SUPERVISION OF CS TO BEGIN NO LATER THAN 5/19/21 |
| Aug 7, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER.PERMIT #321357232 ON 8/5/2020 DUE TO CONSTRUCTION SUPERINTENDENT WITHDRAWAL |
| Aug 7, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER.PERMIT #321357232 ON 8/5/2020 DUE TO CONSTRUCTION SUPERINTENDENT WITHDRAWAL |
| Apr 17, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 16, 1992 | VP*-VIOLATION UNSERVED ECB- DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |