NYC Building Report

Brooklyn East Williamsburg

333 Graham Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

14 records

Date Status Type Summary
Apr 29, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT #B01182203-I1 ON 3/23/26, DUE TO CONSTRUCTION SUPERINTENDENT WITHDRAWAL.
Jan 27, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.DUE TO FIRE ON 1/25:ROOF PARAPET @EXP1 PRTLLY CLLPSD;ROOF JOISTS SEVERELY FIRE DMGD;FIRE SEPARATION CMPRMSD@2RDFL EXP2&4 PRTLY WALLS@331&335.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&FILE RPAIR DWGS W/DOB BLDG TO BE PERM RPAIRD UNDR PRMT STRTNG BY 3/24/25&CMPLTD/SGND
Jan 27, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER.DUE TO FIRE ON 1/25/25&1/26/25,ROOF PRTLLY OPEN W/SHEATHNG BURND/REMOVD;ROOF JOISTS SEVERELY FIRE DMGD;EXP1 PARAPET PRTLLY CLLPSD;FIRE OPERATION CMRPMSD W/DTACHD BRCK NOGGNG.OWNR TO IMMED RTAIN NYSPE,DEMO GC,ASBESTOS GC 1.PE TO SBMT MEANS&METHDS TO DOB &DEP TO IMMED TEMP SHORE BLDG(AS REQ'D)
Jan 26, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLIANT. OBSERVED BUILDING WINDOWS AND DOORS OUT DIMISSING WALLS BETWEEN BUILDINGS MISSING , JOIST CHARRED, WATER D AMAGED , ROOF OPEN OPEN FOR THE ELEMENTS DUE TO FIRE AT 335 GRAHAM AVE NUE BK. VACAATE ENTIRE BUILDING STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANCE MANNER
Jan 26, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL OBSERVED BUILDING WINDOWS AND DOOR OUT DEMISSING WALL MISSING BETWEEN BUILDING JOIST CHARRED , ROOF OPEN FOR ELEMENTS DUE TO FIRE OWNER TO HIRE NYSPE TO SUBMIT TO ERTINSPECTIONS@BUILDINGS.NYC.GOV-718- 286-3460 WITH IN 30 DAYS ADRESSING CONDITIONS WITH PLANS
Jun 30, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Apr 25, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Nov 8, 2019 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Oct 16, 2018 V-DOB VIOLATION - ACTIVE P-PLUMBING NONE THE DOB INTENDS TO REVOKE ALL APPROVALS AND PERMITS UNDER PLUMBING LAA #340263896 DUE TO SUSPENSION OF MASTER PLUMBERS LICENSE. STOP ALL PLUMBING WORK UNDER ABOVE MENTIONED PERMIT AND OBTAIN A NEW MASTER PLUMBER TO SUPERSEDE THE PLUMBING PERMIT
Apr 6, 2018 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Feb 24, 2017 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Oct 1, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT