Brooklyn East Flatbush-Rugby
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-04606-0083), so they can include other buildings on the same lot.
64 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Aug 9, 2006 | B | NOV SENT OUT | 1FL | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 1FL, 1st STORY, APARTMENT AT NORTH |
| Apr 18, 2003 | B | NOV SENT OUT | 2FL | § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE UPPER SASH GLASS AT EAST WINDOW IN THE 1st ROOM FROM EAST LOCATED AT APT 2FL, 2nd STORY |
| Apr 18, 2003 | B | NOV SENT OUT | Not available | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRIC FIXTURE AT EAST WALL AT PUBLIC HALL, 2nd STORY |
| Apr 18, 2003 | B | NOV SENT OUT | 2FL | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2FL, 2nd STORY |
| Apr 18, 2003 | B | NOV SENT OUT | 2FL | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR SOUTH WALL IN THE KITCHEN LOCATED AT APT 2FL, 2nd STORY |
| Apr 18, 2003 | B | NOV SENT OUT | 2FL | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS IN THE BATHROOM LOCATED AT APT 2FL, 2nd STORY |
| Feb 15, 2001 | B | NOV SENT OUT | 2FL | § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE WOODEN TREAD STAIR 2ND DOWN FROM IN THE PUBLIC HALL LOCATED AT PUBLIC PARTS 2FL, 2nd STORY |
| Feb 15, 2001 | B | NOV SENT OUT | Not available | § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE WOODEN PANELING WALLS 1ST.TO 2ND STORY AT PUBLIC HALL, 1st STORY |
| Feb 15, 2001 | B | NOV SENT OUT | 2FL | § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE WOODEN PANELING WALLS PUBLIC HALL 1ST. TO IN THE ENTIRE APARTMENT LOCATED AT APT 2FL, 2nd STORY |
| Feb 15, 2001 | B | NOV SENT OUT | 2FL | § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOORS CLOSET IN THE 1st ROOM FROM EAST LOCATED AT APT 2FL, 2nd STORY |
| Feb 15, 2001 | A | NOV SENT OUT | 2FL | § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2FL, 2nd STORY |
| Feb 15, 2001 | B | NOV SENT OUT | 2FL | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE UNHINGED DOORS CABINET WASH-BASIN IN THE BATHROOM LOCATED AT APT 2FL, 2nd STORY |
| Feb 15, 2001 | B | NOV SENT OUT | 2FL | § 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION COLD WATER SHUT-OFF VALVE WASH-BASIN IN THE BATHROOM LOCATED AT APT 2FL, 2nd STORY |
| Feb 15, 2001 | B | NOV SENT OUT | 2FL | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES FLOOR IN THE BATHROOM LOCATED AT APT 2FL, 2nd STORY |