33 Atkins Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

156 records

Date Status Type Summary
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 25, 2024 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL INSTALL SIDEWALK SHED AT EXPOSURE 1, APPROXIMATELY 20'LINEAR FEET TOTAL
Nov 25, 2024 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL INSTALL SIDEWALK SHED AT EXPOSURE 1, APPROXIMATELY 17' LINEAR FEET TOTAL
Nov 25, 2024 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL INSTALL SIDEWALK SHED AT EXPOSURE 1, APPROXIMATELY 100 LINEAR FEET TOTAL
Nov 22, 2024 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL INSTALL SIDEWALK SHED AT EXPOSURE 1, APPROXIMATELY 140' LINEAR FEET TOTAL
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Aug 29, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 23, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 22, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 22, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 22, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 22, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 16, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ROOF COLLAPSED. PARTIALLY COLLAPSED 2ND FLOOR. UNBRACED EXTERIOR WALL. INADEQUATE BRACING OF THE PARTY WALL.
Aug 16, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: PARTIALLY REMOVED SUB-FLOORING. 5 JOIST REMOVED AND REPLACED WITH NEW JOIST AT 2ND FLOOR ADJACENT TO EXPOSURE # 3. UNBRACED EXPOSURE # 3 WALL AT 2ND FLOOR. INADEQUATE BRACING OF PARTY WALL.
Aug 8, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 8, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 8, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 8, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 8, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 8, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 8, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 8, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 8, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 8, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 8, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 8, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 8, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 8, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 8, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.
Aug 8, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER: ATOI ALL WINDOWS, DOORS, WALLS/FIRE STOPPING & INTERIOR FINISHES REMOVED. NUMEROUS CRACKS AND DETERIORATED MORTAR JOINTS ON EXTERIOR BUILDING WALLS. LEANING PARAPET, PLUMBING AND ELECTRICAL REMOVED. BUILDING OPEN TO ELEMENTS.