Brooklyn Williamsburg
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 19, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER. NOTED AT THE TIME OF INSPECTION, OBSERVED AT EXPOSURE 1 VERTICAL CRACK ON STUCCO AND DETERIORATED ROOF/PARAPET CORNICE. REMEDY: REPAIR AND/OR REPLACE |
| Apr 15, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL SIDEWALK SHED AT EXPO 1 - APPROXIMATELY 50 FT + 10 FT FOR BOTH ADJACENT PROPERTIES PROTECTION. TOTAL EXPO 1 = 60 LINEAR FT |
| Apr 15, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE &/OR APPURTANCES IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION IT WAS OBSERVED DETERIORATED ROOF/PARAPET CORNICE, CRACKS ON BRICK FACADE AND ON WINDOW LINTEL. REMEDY: REPAIR AND/OR REPLACE |
| Oct 21, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED DEFECTED ROOF CORNICE, DEFECTED WINDOW SILL, DAMAGED JOINTS; CRACK AND SPALLING. REMEDY: REPAIR AND/OR REPLACE |
| May 21, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED MISSING DAMAGE SECTION CORNICE AT EXPOSURE 1. IT SHOWS SIGNS OF ROTTEN AND A PIECE HAS ALREADY FALLEN OR REMOVED. ALSO AT EXPOSURE 1 OBSERVED ON CRACKS ON CONCRETE FACADE. REMEDY: REPAIR AND/OR REPLACE |
| Apr 13, 2022 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |