Brooklyn Bedford-Stuyvesant (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 31, 2024 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | THE DEPARTMENT OF BUILDINGS INTENDS TO REVOKE THE PERMIT AND APPROVALS ISSUED IN CONNECTION TO JOB# B00917927. DUE TO SUSPENSION OF THE MASTER PLUMBER'S LICENSE #2286. ALL PLUMBING WORK IN CONNECTION WITH THIS APPLICATION HAS BEEN ORDERED STOPPED IMMEDIATELY. |
| Sep 25, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE2COMPLY W COMMISSIONER'S ORDER CONTAINED IN.VIOLATION #082923CE30301JR,CONTRL#358952,ISUD 08/29/23.COMPLY BY 10/2/23 |
| Sep 25, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE2COMPLY W COMMISSIONER'S ORDER CONTAINED IN VIOLATION #082923CE30302JR,CONTRL#358953,8/29/23.COMPLY BY 10/2/23 |
| Aug 29, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | W-SHAPE STEEL GIRDERS SUPPORTING EX.WOOD STRUCT INSTALLD @CELLAR.LVL W/O SHORING,EX.WOOD JOIST=DAMAGED&STEEL GIRDER REMAINS IMPROPERLY SUP- PORTD.W/O THE PROPER PRE-LOADING & LOAD PATHS. REMEDY: COMPLY W CODE, IMED RETAIN LIC RDP2PREPAR&FILE PERM RPR DRWGS TO BE FILED BY 9/4, COM MENCE WORK UNDER PERMIT BY 9/18/2023 |
| Aug 29, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | W-SHAPE STEEL GIRDER SUPORTNG EXISTNG WOOD STRUCTURE INSTAL-LED@CELLAR LVL W/O SHORING.EXISTNG WOOD JOIST=DAMAGD&STEEL GIRDER IMPROPERLY.SUP- PORTED W/O PROPER PRE-LOADNG & LOAD PATHS. REMEDY: COMPLY W CODE, RETAIN LIC NYS PE2STABILIZE&SHORE UNSUPPORTED STRUCT/JOISTS&STEEL GIR- DERS,FILE S/S PLANS BY 9/4,STRT WORK BY 9/11 |
| Aug 1, 2023 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED @ EXPO #3 STEEL STRUCTURAL BEAMS INSTALLED INTO WALL BETWEEN CELLAR BSMT & @ EXPO #1 FOUNDATION WALL. FOUNDATION WALL WAS ALTERED T O INSTALL 12X12X20 I-BEAMS. BEAMS WERE NOT WELDED & WERE NOT PROPERLY SUPPORTED ADEQUATELY |