Brooklyn Fort Greene
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
54 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 23, 2024 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION |
| Apr 22, 2023 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022) |
| Feb 22, 2023 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Aug 21, 2022 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021) |
| Dec 17, 2021 | V*-DOB VIOLATION - DISMISSED | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | FAILURE TO PERFORM CATEGORY 5 INSPECTION |
| Dec 17, 2021 | V*-DOB VIOLATION - DISMISSED | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | FAILURE TO PERFORM CATEGORY 5 INSPECTION |
| Dec 17, 2021 | V*-DOB VIOLATION - DISMISSED | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | FAILURE TO PERFORM CATEGORY 5 INSPECTION |
| Dec 17, 2021 | V*-DOB VIOLATION - DISMISSED | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | FAILURE TO PERFORM CATEGORY 5 INSPECTION |
| Dec 17, 2021 | V*-DOB VIOLATION - DISMISSED | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | FAILURE TO PERFORM CATEGORY 5 INSPECTION |
| Jun 20, 2021 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2020 |
| Mar 16, 2020 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION |
| Mar 16, 2020 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION |
| Jan 24, 2020 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Oct 9, 2019 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Jul 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018 |
| Sep 15, 2017 | V*-DOB VIOLATION - DISMISSED | HVIOS-NYCHA ELEV ANNUAL INSPECTION/TEST ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jun 1, 2016 | V*-DOB VIOLATION - DISMISSED | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | FAILURE TO PERFORM CATEGORY 5 INSPECTION |
| Aug 7, 2014 | V-DOB VIOLATION - ACTIVE | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | CYCLE 7 UNSAFE REPORT FILED |
| Aug 30, 2013 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 |
| Aug 30, 2013 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 |
| Aug 30, 2013 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 |
| Mar 18, 2010 | V-DOB VIOLATION - ACTIVE | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL |
| Dec 5, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER REMEDY; REPAIR DEFECTS FORTHWITH OBTAIN ALL NECESSARY PERMITS |
| Feb 21, 2008 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 30, 2007 | V*-DOB VIOLATION - DISMISSED | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL |
| May 21, 2007 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Mar 19, 2003 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 8, 2002 | V*-DOB VIOLATION - DISMISSED | L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED | L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED |
| Aug 8, 2002 | V*-DOB VIOLATION - DISMISSED | L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED | L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED |
| Aug 8, 2002 | V*-DOB VIOLATION - DISMISSED | L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED | L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED |
| Mar 26, 2002 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 7, 2000 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |