| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 6, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO OBSERVED SUBSTANTIAL DEBRIS ON SECOND LEVE L OF DEMOLISHED BUILDING.CONDITION POSES AN IMMEDIATE HAZARD TO PUBLIC REMEDY:IMMEDIATELY INSTALL SIDEWALK SHED AT EXP1 WEST ELEVATION |
| Jan 19, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO HAZARDOUS CONDITIONS.EXPO#1 OPEN/MISSING WINDOWS THREE FLRS UP&ROOF THAT AREAS TO BE MISSING.THESE CONDITIONS ARE OF LICECSED TO WEATHER.REMEDY:IMMEDIATELY REPAIR ALL HAZARDOUS CONDITIONS REPAIR OR REPLACE UNDER SUPERVISION OF IICENSED |
| Jan 19, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.EXPOSURE#1 OPEN WINDOWS MISSING WINDOWS ON THIRD FLOOR MISSING ROOF THIS CONDITIONS APPEARS TO BE HAZ.AND NEEDS TO BE REPAIRED.REMEDY:REPAIR& OR REPLACE ALL HAZARDOUS CONDITIONS |
| Dec 13, 2023 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 15, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.BLDG IN AN EXTREME STATE OF DISREPAIR ALL ROOF&FLOOR JOISTS CLLPSD EXCEPT FOR A FEW REMAINING JOISTS THAT A SEVERELY DETERIOATD.TOPS OF ALL PERIMETER WALLS ARE SEV DETERIORATED.1.IMMED INSTALL VERT SHORNG@CELLAR &1STFL LVLS OF FRONT WALL PER PE, 2.INSTALL OVRHRD PROTECTION ADJ FRNT WALL@INTERIOR |
| Oct 11, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AS NOTED: AT THE TIME OF INSPECTION OBSERVED ON EXPOSURE#1OPEN/MISSING WINDOWS ON THE THIRD FLOOR MISSING ROOF THIS CONDITIONS APPEAR TO BE HAZARDOUS AND NEED TO BE REPAIRED IMMEDIATELY.REMEDY:REPAIR AND OR REPLACE ALL HAZARDOUS CONDITIONS |
| Nov 1, 2022 | V-DOB VIOLATION - ACTIVE | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Sep 28, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BUILDING IN CODE COMPLIANT MANNER. BLDG ROOF AND SOME WINDOWS ARE MISSING. BLDG APPEAR TO BE IN SAME CONDITION AS MENTIONED IN PREVIOIS DOB SUMMONS #05182022LL04RF. NOW RK IN PROGRESS AS THIS TIME REMEDY: REPAIR AND OR REPLACE DAMAGED FACADE AND APPURTENANCES SUCH AS WINDOWS, DOORS ROOF AS PER CODE |
| May 18, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. BUILDING ROOF IS MISSING, ALSO TOP FLOOR WINDOWS ARE MISSING. NO WORK IS IN PROGRESS AT THIS TIME. REMEDY: OBSTAIN VALID REQUIRED WORK PERMIT, REPLACE ROOF AND WINDOWS AS PER CODE |
| Jun 28, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM EXTERIOR BUILDING WALLS/FACADE AND APPURTENANCES. AT THE TIME OF INSPECTION, OBSERVED AT EXP 1 WEST ELEVATION,SPALLED BRIACKS,OPEN MORTAR JOINTS AND CRACKS IN MASONRY. REMEDY: MAINTAIN EXTERIOR BUILDING WALLS/FACADE AND APPURTENANCES |