NYC Building Report

Brooklyn Park Slope

316 5 Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

14 records

Date Status Type Summary
Nov 8, 2019 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Oct 1, 2015 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Mar 3, 2015 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
May 15, 2014 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Dec 13, 2011 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Jan 1, 2009 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jan 3, 2008 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 26, 2007 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ONGOING CONSTRUCTION PERMIT # 302052196 GUTTED OUT CELLAR THRU 3RD FL, LEAVING EXPOSED JOISTS AND STAIRS WITHOUT ANY GUARDRAILS OR ANY OTHER TYPE OF PROTECTION AT FLOOR OPENING.ALSO LOOSE BRICKS IN OLD FIREPLACE REMEDY:STOP ALL WORK/MAKE SAFE AND PROVIDE PROTECTION,CALL DOB AT 718/802/3707,PRIOR TO RESUMING WORK
Feb 26, 2007 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ON GOING WORK PERMIT #302052196.EXCAVATED ENTIRE CELLAR APPROX,2.5'D AND INSTALLED CONCRETE SUPPORT APPROX 3'X2'AT PART OF FRONT (EAST SIDE FOR APPROX 50'L AND SAID WORK NOT SHOWING ON APPROVED PLANS OF 11/8/06 REMEDY:STOP ALL WORK/MAKE SAFE,CONFORM TO OR AMEND PLANS.CALL DEPT OF BLDGS,AT 718/802/3707.PRIOR TO FURTHER CONSTRUCTION
Jan 19, 2007 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jan 6, 2006 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jan 31, 2005 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 27, 2001 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 22, 1989 V*-DOB VIOLATION - DISMISSED B-BOILER BOILER OPTIONAL B-BOILER BOILER OPTIONAL