Brooklyn Flatlands
3116 Garage Avenue I, Brooklyn
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 2, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | FULLY DEMOLISH THE BUILDING, GRADE AND FENCE SITE |
| Apr 2, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | IMMEDIATELY INSTALL TIGHTBOARD FENCE AT EXP 1,2,3 AND 4 (APPROXIMATELY 130 LINEAR FEET) |
| Mar 29, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUIDLIGN IN CODE COMPLIANT MANNER. AT TIMEOF INSPE CTION OBSERVED ROTTED OPEN ROOF, 2ND FLOOR COLLAPSED ONTO 1ST FLOOR , EXP.#2 WALL BOWING. REMEDY/REQUIREMENTS : OWNER TO HIRE NYSPE TO SUBMI T REPORT TO ERTINSPECTIONS @ BUILDINGS.NYC.GOV WITHIN 5 DAYS ADDRESSIN G ALL CONDITIONS WITH PLANS, PHOTOS, RECOMENDING TIME FRAME & REPAIRS |
| Nov 14, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OBSERVED BUILDING ROOF IN STATE OF DISREPAIR. BUILDING ROOF 70% COLLAPSE AND BUILDING ROOF OPEN TO THE ELEMENTS. EXPOSURE#2 WALL BULGING. FRONT ENTRANCE HAVE LARGE CRACKS AND PARTIALLY DISPLACED. AT EXP#1 STORM WATER GUTTERS DISPLACED AND HANGING. VACATE ENTIRE BUILDING. |
| Nov 14, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OBSERVED BUILDING ROOF IN STATE OF DISREPAIR. BUILDING ROOF 70% COLLAPSE AND BUILDING ROOF OPEN TO THE ELEMENTS. EXPOSURE#2 WALL BULGING. FRONT ENTRANCE HAVE LARGE CRACKS AND PARTIALLY DISPLACED. |