NYC Building Report

Brooklyn Flatlands

3116 Garage Avenue I, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

5 records

Date Status Type Summary
Apr 2, 2024 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL FULLY DEMOLISH THE BUILDING, GRADE AND FENCE SITE
Apr 2, 2024 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL IMMEDIATELY INSTALL TIGHTBOARD FENCE AT EXP 1,2,3 AND 4 (APPROXIMATELY 130 LINEAR FEET)
Mar 29, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUIDLIGN IN CODE COMPLIANT MANNER. AT TIMEOF INSPE CTION OBSERVED ROTTED OPEN ROOF, 2ND FLOOR COLLAPSED ONTO 1ST FLOOR , EXP.#2 WALL BOWING. REMEDY/REQUIREMENTS : OWNER TO HIRE NYSPE TO SUBMI T REPORT TO ERTINSPECTIONS @ BUILDINGS.NYC.GOV WITHIN 5 DAYS ADDRESSIN G ALL CONDITIONS WITH PLANS, PHOTOS, RECOMENDING TIME FRAME & REPAIRS
Nov 14, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL AT TIME OF INSPECTION OBSERVED BUILDING ROOF IN STATE OF DISREPAIR. BUILDING ROOF 70% COLLAPSE AND BUILDING ROOF OPEN TO THE ELEMENTS. EXPOSURE#2 WALL BULGING. FRONT ENTRANCE HAVE LARGE CRACKS AND PARTIALLY DISPLACED. AT EXP#1 STORM WATER GUTTERS DISPLACED AND HANGING. VACATE ENTIRE BUILDING.
Nov 14, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL AT TIME OF INSPECTION OBSERVED BUILDING ROOF IN STATE OF DISREPAIR. BUILDING ROOF 70% COLLAPSE AND BUILDING ROOF OPEN TO THE ELEMENTS. EXPOSURE#2 WALL BULGING. FRONT ENTRANCE HAVE LARGE CRACKS AND PARTIALLY DISPLACED.