Brooklyn East Williamsburg
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 1, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT |
| Jan 3, 2008 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 23, 2000 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. NOTED: AT LEATHER STORE AN OPENING WAS CUT IN FLOOR TO THE CELLAR. A STAIRCASE WAS BUILT FROM THE STORE TO THE CELL_ AR. FULL HEIGHT PARTITION WALLS WERE BUILT OF PLYWOOD IN THE CELLAR REMEDY: OBTAIN PERMITS IF FEASIBLE OR RETURN PREMISES TO PRIOR LEGAL CONDITION |
| Jul 12, 1999 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: AT TIME OF INSPECTION AN ALTERATION WAS OCCURING AT 1ST FLOOR STORE LOCATED AT CORNER OF COOK STREET. EX- ISTING SUSPENDED CEILING REMOVED AND CORRUGATED METAL SHEETING WERE INSTALLED. REMEDY: OBTAIN A PERMIT FORTHWITH OR RESTORE THE PREMISES TO PRIOR LEGAL CONDITION |
| Feb 10, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jul 25, 1995 | VWH*-VIOLATION WORK W/OUT PMT HAZARDOUS DISMISSED | P-PLUMBING NONE | HAZ |
| Aug 16, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |