DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 6, 2021 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Oct 27, 2020 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| May 21, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Mar 26, 2009 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT; FOUND AT TIME OF INSPECTION 2 MEN AT WORK IN PROGRESS CONSTRUCTING/REBUILDING THE FRONT ENTRY STAIRS, NO PERMIT POS TED. WORK IS 60% COMPLETED, STAIR IS ABOUT 5' 0" X4' 0", REMEDY: STOP ALL WORK OBTAIN A PERMIT |