NYC Building Report

Brooklyn Midwood

3005 Avenue L, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

6 records

Date Status Type Summary
Jul 31, 2024 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.FEU OBSERVED THAT THE ILLEGAL CONSTRCTN TOOK PLACE@THE 1STFL REAR SHARED WALL OF 3003&3005 APPRX 25FT OF THIS SHARED WALL WAS RMVD&RPLACD W/A STEEL BEAM
Jul 29, 2024 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLIANT. DUE TO STRUCTURAL STABILITY COMPROMISED . VACATE REAR OF SYNAGOGUE ON FIRST FLOOR AT EXPOSURE#3.
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
Dec 31, 2009 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
Jan 1, 2009 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Sep 16, 1997 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED