Brooklyn Flatbush
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 2, 2021 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Jul 7, 2020 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPROXIMATELY 60 LINEAR FEET OF SIDEWALK SHED COVERING THE ENTIRE WIDTH OF THE MAIN ENTRY WAY AND TO EXTEND FROM THE ENTRANCE TO THE SIDEWALK AT EXPOSURE 1 IN ORDER TO SAFE GUARD THE PUBLIC AND PROPERTY |
| Jul 6, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT APT E7, WALLS AND CEILINGS HAVE BEEN REMOVED, ROOF OPEN, SMOKE DAMAGE THROUGHOUT, ALSO IN APT E8 IN BEDROOM, CEILING OPEN, WINDOW OUT AND OPEN ROOF ABOVE DUE TO FIRE AND FIRE FIGHTING OPERATIONS AT 30 LINDEN BLVD. |
| Nov 8, 2019 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |